Kitchen and Bathroom Tiles are completed. The bathroom wall porcelain tiles are installed up to 52" with a border.
The Light-gage stud partitions are installed. Ready for inwall pipes and conduits, prior to sheet rock (gypsum panel) installation
The construction of Built-out Turkish Center Built-out started as of July 17th, 2009, upon receiving the permit from the city.
The permit and our "Turkevi" sign are posted. The trush container, and portable WC were placed.